Smoke Test of Ventilation System

  • Home
  • Smoke Test of Ventilation System
dots2
phcc slika 1

Project Overview

We conducted an extensive smoke test across 10 locations in the basement area of the Primary Health Care Corporation (PHCC) facility. This assessment ensured that the ventilation system operates efficiently, maintaining proper air circulation and smoke control for enhanced safety and full compliance with building regulations.

  • Project NameSmoke Test of Ventilation System
  • ClientPrimary Health care Corporation
  • Websitewww.phcc.gov.qa

Project Objective

Conduct a comprehensive smoke test to assess the performance of the basement ventilation system at PHCC.
Identify and address any airflow issues, blockages, or inefficiencies in smoke extraction.
Ensure the system meets safety standards and effectively manages smoke in emergency situations.

slika 2
slika 3
slika 4

Scope of Work

Preparation
  • Conducted a pre-test assessment to determine 10 key testing locations in the basement ventilation system.
  • Implemented necessary safety measures, including air quality monitoring and PPE for the testing team.
  • Coordinated with PHCC facilities management to schedule the test with minimal operational disruption.
Smoke Testing & Analysis
  • Introduced controlled smoke at 10 locations to simulate emergency conditions and assess ventilation performance.
  • Monitored smoke movement, airflow, and extraction efficiency to verify system compliance with design specifications.
  • Identified potential air leaks, blockages, or inefficiencies affecting emergency smoke management.
Reporting & Compliance
  • Delivered a comprehensive report detailing system performance, observations, and areas for improvement.
  • Provided actionable recommendations to enhance ventilation efficiency and ensure full compliance with fire safety regulations.

Key Achievements

Successfully completed smoke testing at 10 critical basement locations, verifying the ventilation system’s effectiveness under emergency conditions.

Identified and documented potential system inefficiencies, ensuring proactive recommendations for performance enhancements.

Ensured full compliance with safety regulations and building codes, reinforcing the facility’s fire and smoke management readiness.

Challenges Overcome

Effectively coordinated with PHCC staff to conduct testing with minimal impact on daily operations.

Implemented strict safety measures to protect the testing team while ensuring accurate and reliable results.

Conclusion

The successful completion of the smoke test at PHCC provided crucial insights into the efficiency of the basement ventilation system. By identifying areas for improvement, we helped ensure the system’s ability to manage smoke and air circulation effectively during emergencies. This project underscores our dedication to enhancing safety and regulatory compliance in healthcare and other critical facilities.