Supply, installation, rectification and maintenance / UDC

  • Home
  • Supply, installation, rectification and maintenance / UDC
dots2
UDC slika 1

Project Overview

This project focused on the supply, installation, rectification, and maintenance of fire alarm, firefighting, and fire suppression systems across various facilities managed by the United Development Company (UDC). The objective was to strengthen fire safety infrastructure, ensuring all UDC facilities were equipped with modern fire protection systems compliant with both local and international safety standards. The scope of the project also encompassed rectifying any outdated or malfunctioning fire protection systems to ensure operational efficiency and safety

  • Project NameSupply, installation, rectification and maintenance / UDC
  • ClientUnited Development Company
  • Start DateJanuary 2022- ongoing
  • Websitewww.udcqatar.com

Project Objective

The project entailed supplying and installing modern, compliant fire alarm, firefighting, and fire suppression systems across various UDC facilities, replacing or upgrading outdated or faulty fire protection systems to ensure reliability and compliance with current safety codes, providing regular maintenance and inspection services for continuous functionality, ensuring that all systems are installed and maintained in compliance with local fire safety regulations and international standards, and minimizing downtime and disruptions during installation and rectification works.

slika 2
slika 3
slika 4

Scope of Work

The project involved the supply and installation of fire alarm, firefighting, and fire suppression systems across UDC facilities, including the rectification of outdated or faulty systems to ensure compliance with safety standards. Routine inspections and maintenance were provided to ensure continuous functionality and extend equipment lifespan. Documentation, including manuals and maintenance schedules, was also supplied. The successful installation and rectification were completed on time, with positive feedback from UDC management for seamless integration and high-quality service. The project achieved full compliance with local and international fire safety regulations.

Key Achievements

The project focused on the supply and installation of fire alarm, firefighting, and fire suppression systems at UDC facilities, along with the rectification of outdated or faulty systems to meet safety standards. Routine inspections and maintenance were provided to ensure ongoing system functionality and prolong equipment lifespan. Documentation, such as manuals and maintenance schedules, was delivered. The project was successfully completed on time, with UDC management praising the seamless integration and quality of service. Full compliance with both local and international fire safety regulations was achieved.

Challenges Overcome

The project involved coordinating installations and rectifications without disrupting ongoing operations at UDC facilities, ensuring new systems were compatible with existing infrastructure and managing any necessary upgrades. Strict safety standards were adhered to while working in occupied spaces, and ongoing maintenance of fire systems across multiple facilities was efficiently managed.

Conclusion

The successful completion of this project has greatly enhanced the fire safety infrastructure at Qatar Airways’ key facilities. By installing essential fire alarm, firefighting, and fire suppression systems, coupled with ongoing maintenance and training, we ensured that Qatar Airways is fully prepared for emergencies with operational, compliant fire safety systems. This project showcases our expertise in delivering comprehensive fire safety solutions, from initial installation and rectification to long-term maintenance and support.